I moved my blog to a new address...
http://xjamforthelambx.blogspot.com/
Saturday, December 31, 2011
Saturday, December 10, 2011
Grinding, Cab 95% done
Kevin called me in to grind the welds in the floor pan and toeboard. The firewall/toeboard customization is done. Just hitting odds and ends now.
Tuesday, December 6, 2011
Monday, December 5, 2011
Splurging - Swamp Cooler
Now I have to stop spending money. I splurged on 12/03/2011 and bought a swamp cooler. I think these things look so cool. Even though they are made for the desert southwest, and don't work in humid climates, I had to have it. However, I will probably be the only one in the midwest with one!
Pics of the actual item. $335 with shipping, not too bad of a deal.
Smooth Firewall
In the process of smoothing out the firewall on 12/02/2011. Kevin gave me a chance to "approve" the changes before putting in the modified (from original) distributor hump and toeboard.
Friday, November 4, 2011
Clock Housing Found - SCORE!!!!!
I found the SUPER-RARE optional clock housing for my '54! And its NOS! $140 with shipping is a steal.
Now I'm hoping to find the cattle guard.
Wednesday, October 5, 2011
Por 15
Applied Por 15 to the inner structure before its permanently sealed off this week. Reminder, wear rubber gloves and don't use a sponge style brush!
Wednesday, September 7, 2011
Cab Resurrection Begins...
It's 09/06/2011 and I'm about 3 weeks into resurrecting the cab. After hours and hours and hours or sandblasting, we found all the problem areas. And MAN, there are alot of them! Thank you rat pee for leaving your mark! Anyway, we tore off the outside rear/lower and upper rear/inner panels, because of the rust/pits. The main brace between the upper and lower panels was a home for the mice, so that was shot too. At least we're doing it right. It can only look better from here!
Expect changes to the firewall soon.
The pile of metal we tore out.
Sunday, May 15, 2011
Body Work - Doors
On 5/11/11 I brought all 4 of my doors to Kevin and we decided on the best 2. Jack I dissassembled the doors in prep for sandbasting. We have a couple holes to fill and the inside/bottom of the doors will need to be replaced with the patch panels I purchased. This is common in these trucks.
Friday, January 7, 2011
Bringin' it home
Suspension, motor/tranny mounts, wheels, major frame work complete. Time once again to save/sell on eBay!
Saturday, January 1, 2011
IFS/Rearend and Cab Mockup
After installing the Mustang II IFS on 12/29/2010, we preceeded with bringing in the cab to install the motor/transmission mounts and the rearend on New Years Day 2011. AWESOME!!!
New Years Day 2011 - WHAT A WAY TO START THE YEAR!
New Years Day 2011 - WHAT A WAY TO START THE YEAR!
Subscribe to:
Posts (Atom)